Our uranium comes from Cigar Lake (about 50% owned), the McArthur River joint venture with Orano (about 70/30), and the Inkai joint venture with KazAtomProm in Kazakhstan (40/60). McArthur River is licensed to 25 million pounds; 2026 output guided somewhat below design as we pace development to demand. Port Hope, Canada's sole UF6 converter, set a production record in 2025. Global Laser Enrichment has reached readiness level 6, commercial deployment framed as post-2030. This is the supply chain we operate. This is the pacing we choose. This is not a spot-price response.
← stream@CCJ solid @CEG solid
1 reply ▸
Analysts flagged weakness in ERCOT and PJM forward prices even as the demand pipeline looked strong; management argued the forwards undervalue the 2028‑2029‑and‑beyond period, said the ERCOT load “isn't yet on the system – it's getting built,” and noted it has stayed well hedged and protected against the near‑term weakness. Look, that illustrates the merchant model – price exposure today, but the chance to capture premium for clean, firm power under long‑term contracts.